How to Read Date Codes and Lot Codes
Date codes and lot codes tell you when a part was made and which production run it came from. This guide explains how to read them, what to check, and when to ask questions.
Home / News / How to Read Date Codes and Lot Codes
November 2026
What a Date Code Tells You
A date code is a short marking that shows when a part was made. It is printed on the part itself and on the label of the reel, tray, or tube. Buyers use it to check freshness, to plan stock rotation, and to confirm that the parts on a delivery match what was quoted.

The year and week format
The most common format is four digits. The first two digits name the year and the last two name the week of the year. A code of 2435 means the part was made in week 35 of 2024. A code of 2508 means week 8 of 2025. When the year is shown with one digit only, ask the supplier to confirm the full year, because a single digit can mean more than one year.
Other formats you may see
Some makers use year and month, and some use a letter for the month. The marking section of the datasheet shows the format for that part. If the code on the part does not match the datasheet, stop and ask the supplier before you accept the parts.
What a Lot Code Tells You
A lot code names the production run a part came from. Parts with the same lot code were made in the same run, under the same conditions. The lot code links a part to its test records and to the materials used in that run. When a quality issue appears, the lot code shows which parts are affected and which are not. Keep the lot code with your receiving records so you can trace a part back to its run later.
Checks Before You Accept a Delivery

Check three things when the parts arrive. First, the date codes should be consistent across the whole delivery. A single reel or tray should carry one date code, not a mix. Second, the date code and lot code on the parts should match the label and the delivery documents. Third, the date code should fit the life cycle of the part. A very old date code on a part that is still in production needs an explanation, and a date code in the future is a clear error. Note the date code and lot code in your receiving record, and store parts with the oldest date code where they will be used first.
What to Ask the Supplier
Ask for the lot code and date code before you place the order, not after the parts arrive. Ask for a photo of the part marking and the label when the quantity is large or the part is high value. Ask for a certificate of conformance that names the part, the quantity, the lot, and the date code. A supplier that can answer these questions quickly and with documents is easier to trust. If the answers are vague or the documents do not match the parts, hold the delivery and ask for clarification before the parts go on the line.
Related Reading
How to Spot Counterfeit Electronic Components
Keeping a Legacy Product in Production When Parts Go Obsolete
Written by Casey Xia
Casey Xia handles component sourcing enquiries at Potrgo, covering BOM quotation, shortage lines, and alternatives screening. These articles collect the checks and decisions behind that work. More about the author · Casey Xia on LinkedIn
