Sample BOM Example: A Filled In BOM Line by Line for Quotation
A filled in BOM example shows every line a supplier needs to quote: full part number, quantity per set, number of sets, total quantity, and packaging. This guide works through a six line sample BOM with real part numbers and explains what each field does and what goes wrong when it is missing.
Home / News / Sample BOM Example: A Filled In BOM Line by Line for Quotation
November 2026
What Does a Complete BOM Line Contain?
A bill of materials, or BOM, is the list a buyer sends when asking for a quotation. A complete line names the part, says where it goes on the board, states how many are needed, and names the packaging. When all four facts are present, a supplier can quote the line in one pass.
Each line in the sample below carries seven fields. Reference shows the designator on the board, such as U1 or R1. Part number is the full manufacturer number with its suffix. Description states the value, the package, and the key rating. Quantity per set and number of sets give the total quantity. Packaging names the form the parts arrive in. Notes carry anything else the supplier must know.
What Does a Filled In BOM Look Like?
The sample below is a small control board built in 100 sets. It has six lines: three integrated circuits, one resistor value, one capacitor value, and one connector. Note that every cell is filled in. A blank cell is a question the supplier will have to ask.
| Line | Reference | Part Number | Description | Qty per Set | Sets | Total Qty | Packaging |
|---|---|---|---|---|---|---|---|
| 1 | U1 | STM32F429ZIT6 | MCU, ARM Cortex M4, LQFP144 | 1 | 100 | 100 | Tray |
| 2 | U2 | TPS53647RTAR | Buck controller, VQFN | 1 | 100 | 100 | Tape and Reel |
| 3 | U3 | LM358DR | Dual op amp, SOIC8 | 2 | 100 | 200 | Tape and Reel |
| 4 | R1 to R40 | RC0603FR-0710KL | Resistor, 10k, 1%, 0603 | 40 | 100 | 4000 | Tape and Reel |
| 5 | C1 to C20 | GRM155R71H104KE14D | Capacitor, ceramic, 0.1 uF, 50 V, 0402 | 20 | 100 | 2000 | Tape and Reel |
| 6 | J1 | B2B-XH-A | Header, 2 pin, XH series | 1 | 100 | 100 | Tube |
Sample BOM for a small control board, 100 sets.
Every line in this sample can be quoted without a question back. The quantities follow one rule: total quantity equals quantity per set times number of sets. The resistor line shows why the rule matters. Forty pieces per board times 100 sets is 4000 pieces, a number that is easy to get wrong if only one of the two numbers is written down.
Why Does Each Suffix in a Part Number Matter?
A suffix is the group of letters at the end of a part number. Each letter names one choice: the package, the temperature range, the packaging form, or the grade. Makers reuse one base number for many variants, and the suffix selects the variant.
The STM32F429ZIT6 in the sample shows how the code works. The letters after the base number name the pin count, the temperature range, the package, and the memory size. Change one letter and the part changes. The LM358DR shows the same idea in a shorter number. The D names the SOIC package and the R names tape and reel. An LM358P is the same circuit in a different package, and it will not fit the same board.
A missing suffix is one of the most common reasons a quote comes back wrong. The supplier must guess the variant or stop and ask, and a guess can put the wrong package on the order. Always copy the full part number from the datasheet, suffix included, and check it before the BOM goes out.
What Happens When a BOM Line Is Missing a Detail?
A BOM with gaps does not stop a quote. It slows the quote down. Each gap becomes a question, and each question waits for an answer before the line can be priced. The table below lists the gaps buyers send most often and what each one costs.
| Missing Detail | What Goes Wrong |
|---|---|
| Suffix | Supplier quotes a different package, or the quote waits. |
| Quantity per set | Supplier cannot work out the total quantity and must ask. |
| Number of sets | Total quantity is a guess, and the quote may cover the wrong volume. |
| Packaging | Parts arrive in a form the production line cannot load, and repacking adds time. |
| Reference designator | Parts cannot be matched to the board, and kitting slows down. |
| Description | Value or rating cannot be confirmed, and the wrong part may ship. |
One gap costs one round of questions. A BOM with five gaps can cost five rounds, and each round adds a day while the build date stays fixed. Fill in every field before the BOM goes out, even when the answer feels obvious.
How Should Quantities and Packaging Be Written?
Write quantity per set, number of sets, and total quantity as three separate numbers. The supplier checks the maths, and the buyer checks the quote against the same three numbers. When only a total is written, no one can tell whether it covers the right number of boards.
Spares stay separate from build quantity. Write the build quantity on the line and put spares in the notes column or on their own line, so the production quantity stays clear. A note such as add 5 percent spares tells the supplier exactly what to quote.
Packaging names the form the production line needs. Tape and reel feeds a placement machine. Trays hold large integrated circuits that a reel cannot carry. Tubes hold connectors and parts that are loaded by hand. Name the form on every line, even when the maker sells only one form.
What Should You Check Before You Send a BOM?
Run through this list before the BOM goes out. Each check takes a minute, and each one removes a question the supplier would otherwise have to ask.
- Every line has a full part number with its suffix.
- Every line has a reference designator.
- Quantity per set, number of sets, and total quantity are all filled in, and the maths checks out.
- Packaging is named on every line.
- Notes name any limit, such as a date code limit.
- The file is a spreadsheet with text that can be copied, not a photo or a scan.
- Contact name and delivery location sit on the enquiry, not inside the BOM.
A clean BOM moves fast. When the list is complete, the supplier quotes each line once, and the buyer can compare the quote with the list line by line. If you want the list quoted as one kit, send it through BOM Kitting. The preparation guide shows how to send the list once it is ready.
What Do Buyers Ask Next?
How many lines should a sample BOM have?
As many as the build needs. The six lines here show each field type: integrated circuits, a resistor value, a capacitor value, and a connector. A real BOM may run to hundreds of lines.
Do I need to list packaging on every line?
Yes. The right form differs by part, and the maker may sell the same part in more than one form. Naming the form on each line avoids repacking and avoids a machine stop.
What if I only know the value, not the full part number?
Send the value, the package, the tolerance, and the voltage rating. The supplier can propose a part number, and the buyer confirms it before the order is placed.
Should quantities include spares?
No. Keep build quantity and spares separate so the production quantity stays clear. Put spares in the notes column or on their own line.
Can I send a BOM as a PDF?
A spreadsheet is better because each line can be copied into a quotation. A PDF works when the text can be copied. A photo or a scan slows the quote because each line must be typed out.
Related Reading
How to Prepare a BOM for Quotation
How to Evaluate Component Alternatives
Written by Casey Xia
Casey Xia handles component sourcing enquiries at Potrgo, covering BOM quotation, shortage lines, and alternatives screening. These articles collect the checks and decisions behind that work. More about the author · Casey Xia on LinkedIn